army camp, carport, Hotel, House, Kiosk, Booth, Office, Sentry Box
Aseismic:
grade 8
Material:
Galvanized steel
Color:
White or Customized
Brand:
Jinkai
Packing:
Standard
Min Order:
8
Key Words:
Fast build prefab container hospital
Detail
Frame
Corner Post
2.0mm hot dip galvanized welded steel
Top Girder
galvanized steel tube 1.5x60x120mm
Top Cross Beam
galvanized steel tube 1.5x60x120mm
Bottom Girder
galvanized steel tube 2.3x147x75mm
Bottom Cross Beam
galvanized steel tube 2.3x147x75mm
Top Secondary Beam
galvanized steel tube 1.2x40x60mm
Bottom Secondary Beam
galvanized steel tube 1.2x80x80mm
Connectors
high tensile bolt M12x40mm grade 8.8, top corner, bottom corner
Suface treatment
propylene water base paint, color RAL9018
Roof
PPGI steel Corrugated Board
0.35mm prepainted al-zinc coated steel
Glass Wool
110mm thick, 14kg/m3 density
Steel Ceiling Board
0.23mm prepainted al-zinc coated steel
PVC Cornice
PVC cornice 30x50mm
Floor
base material
15mm MGO board
skirting
black aluminum skirt line
Wall
50mm steel sandwich wall panel
steel thickness 0.23mm, size 950x2505mm, density 30kg/m3, fireproof grade A.
Door
steel door
frame 0.8mm, size 935x1950mm, including lock and stop
Window
PVC window
slide type, dimension 950x1000mm
3mm glass
heat conductive above 2.50W/(M2.K)
Structure
Feature
FLEXIBLECOMBINATION:
Stand alone, or combinedhorizontally to create big open space, or stacked vertically up to 3 stories.
FULL-RANGE FACILITIES: Different types of roof, corridor, canopy, and staircase are available; plusspecialized bathroom and kitchen containers to choose; can be decorated bothinside and outside.
FAST ASSEMBLING:
Averagely 4 workers can erect 1 container within 3 hours. Thecontainer also can be assembled in the factory and then transfer to the site.
SAFE AND DURABLE: Over15year lifetime, seismic resistance to 8 degrees, wind resistance to 11degree
Installation
Flat Pack Container Installation Steps:
1.Placethe base, it is in a horizontal state
2.Installthe corner column, fixed on the base
3.Installationof the base, fixed with bolts
4.Thecorner column and the base vertically tightening bolts.
5.installationdownpipe in corner column.
6.Installouter wall panel and doors and windows.
7.Thepress plate and the chute are fixed , as the bolt is tighteded.
8.Crownmoulding buckled on the plate, sealant is used in the included angle to make itclose.
Here, the overall flat pack container has been basically formed.
Package and Transportation
Questions & Answers
1.Is Prefab cheaper than building?
Costs of prefabs are typically cheaper than stick-built homes by an average of 10%to 20%. Faster Than Traditional Construction. Generally, it takes one to fourmonths longer to build a traditional home than to construct a prefab. Flexible Size and Aesthetic
2.How much does prefab house cost?
The national average cost of a modular home is about $240,000, plus the cost of the land. The cost figure above translates to about $120 persquare foot for a 2,000 square foot modular home without the cost of the land.
3.Which is better prefab or modular homes?
You can save quite a bitof money withprefab homes. Because they're constructed in a factory, they can be builtfairly quickly — in a matter of weeks, as opposed to months — because there areno weather delays. ... But the more complex your design and layout, the more your modular home could cost.
4.What are the cons of a prefab house?
Finding the land,selecting the contractor, preparing the site, involves lots of time and energy.One of the widely known demerit of prefab building is that it does not offer the samelevel of quality as traditional. "These techniques have limitedcustomization and service areas
Jinkai Prefab House
Wenan Jinkai Building Material Co. Ltd
Tel:13910566706 0316-5311144
Address:Dongjie village, Xinzhen Town, Wenan
County, Hebei, China, 065900
Whatsapp:0086 13910566706
Email:brank@diligen.cn click to email us